The cabinets, floor and countertops are in. All that’s missing is the appliances. As the most completed room in the house, it gave me a lot of hope as to what the move-in version of the whole house will be. I will be posting pictures after Christmas.
So far we have the laminate in the dining, kitchen, hallway and foyer. Vinyl is down and all the vanities are in some procession of installation. The master bathroom is looking good too I must say. I spent yesterday adding a second coat to the master bedroom, the dark blue and creamy white trim and door go together well. The light we picked to hang in the foyer goes perfectly—and the window in the center of the house makes that whole area light and airy. This week I want to put a second coat of paint in the study (wow is it red!) and the family room. I’d also like to get the kitchen cabinets dust bustered. And at some point soon Andrew and I are going to attempt laying the laminate floor in the study. Staining the windows is just going to have to wait until we are in the house.
We have a long way to go yet, no light fixtures, no plumber and our garage door is messed up. Downstairs trim won’t go up till next week, the stairs aren’t finished out. I think by January 2 when Kitten must leave the kennel, I will be taking her to a friend’s house. Our mail is getting forwarded so I am going to stop by the apartment complex and see if they will open the mailbox for me. I am not going to the Dublin post office until after Christmas, I am not standing in line for an hour over their crossed wires.
No comments:
Post a Comment